Vehicles
Project details
- Cost: $9.500
- Duration: 3 weeks
- Contract Type: Commercial (CM)
When we were taking up this order, we were briefed that the backup power generator installed at this office building required only a maintenance check…
However, as we’ve begun to perform it we found a lot of discrepancies, which ultimately led us to fixing the whole thing from scratch.
After 3 weeks of tricky work with wirings, it was as good as new, installed back at where it originally was by the members of our crew!